![]() |
|
|||||||
![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
My timing couldn't be better. Today I wrapped up chapter 5 on Cozy MkIV plans #0158. Tomorrow I head to Oshkosh! This is starting out a great week!
Over the weekend I trimmed the front and rear of the sides to 101.75 and today I did the spar cut out. Chapter 5 is done! ![]() ![]() Chapter 5 Done! I have a short punchlist of things I want to do before I actually start on chapter 6: 1: sand the inside of the sides. I didn't peel ply everything and there are somes oopsies and stuff I want to clean up. 2: Small oopsie wher I started through the top longeron in the rear. Only cut about 1/8" into it. Will fill with flox. 3: Measure location and test fit each bulkhead and trim for good fit. 4: Double check all critial dimensions. Now is the time to fix anythign out of whack.
__________________
Ed Boykin Andover, MA Cozy MkIV Plans #0158 Working on Chapter 6 Chapter 5 - Complete 07/26/2010 Chapter 4 - Sometime before I set this .sig |
|
#2
|
||||
|
||||
|
Congrats Ed!
In no time at all you'll be in the 'Flintstone' stage. Keep at it.
__________________
T Mann - Loooong-EZ/20B Infinity R/G Chpt 11, 12 & 13 Got Foam? Mann's Airplane Factory We add rocket's to everything! 4, 5, 6, 7, 8, 10, 14 DONE |
|
#3
|
||||
|
||||
|
That's a nice pair of fuselage side you have there, Ed!
|
|
#4
|
||||
|
||||
|
way to clean, sick i tell you-fake ! photo shoped.
__________________
edited by steve for a good reason |
|
#5
|
||||
|
||||
|
I see only one thing seriously wrong with this picture:
It is too perfect ![]() ![]() ![]()
__________________
Buly It's never too late to have a happy childhood! |
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
|
|